Dredging, Intake/Outfall, River Crossing
Do you have a dredging project that requires construction dewatering?
1,500 linear feet of 5, 6, and 7 foot high water filled barriers were installed in just 10 hours on
Lake Seminole in Florida.
Imagine how long it would take to sheet pile 1,500 linear feet! Save yourself time and money today!
Download the cofferdam Work Site Assessment Sheet
to receive a free quote or call us at 1-800-245-0199.
Do you need a dry worksite for your next intake/outfall construction project?
Aqua Barriers™ were installed on this outfall construction project. 100 linear feet of 6 foot
high dams were installed in under 3 hours.
Give us a call today! We've been simplifying the dewatering process and saving people just like you
time and money since 1996!
Download the cofferdam Work Site Assessment Sheet
to receive a free quote or call us at 1-800-245-0199.
Are you faced with a river crossing project that requires a dry worksite?
This is river crossing project that was done on the Fox River. This portion was located in
Burlington, Wisconsin.
425 linear feet of 6 foot high water filled barriers were installed in about 11 hours.

Give us a call to start saving time and money today!
1-800-245-0199
650 linear feet of 5 foot high dams were used to complete this river crossing on the Fox River in
Yorkville, Illinois.
Stand out among your competitors by using this tried and true cofferdam method.
Download the cofferdam Work Site Assessment Sheet
to receive a free quote or call us at 1-800-245-0199.