Pipelines

Temporary dams by Aqua-Barriers™ were used for this PIPELINE repair on the Staunton River located in Brookneal, Virginia. The 600 linear feet of 6 and 7 foot high water filled barriers were installed in 14 hours.

Combining 6ft high Aqua-Barriers™ with 3ft high Aqua-Barriers™ created a dry work area for this PIPELINE corrosion inspection project in Grant Creek Bemidji, MN.

Aqua-Barriers™ water inflated cofferdams were used for this PIPELINE repair in Texas City, Texas that required construction dewatering.

6 foot high Aqua-Barriers™ portable dams assisted with this PIPELINE installation at the Fox River in Burlington, Wisconsin. 425 linear feet of the water filled barriers were installed in 11 hours.

650 linear feet of 5 foot high Aqua-Barriers™ water inflated cofferdams were used to complete this PIPELINE installation that required construction dewatering in Yorkville, Illinois on the Fox River.